Higher Education

  • HOME
  • Higher Education

Higher Education

Building Automation System Upgrade

Installed System

Schneider Electric EcoStruxure Building Operation (EBO)

Project Scope

Upgrade legacy Distech Controls for control of the following equipment:

  • (5) AHUs
  • (72) VAVs
  • (1) FCU

Contract Value

$475,000

Copyright © 2024 Triton Concepts. All Rights Reserved